[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-346126":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},346126,140,1,"单选题","利用价值工程理论，提高工程建设项目价值可行的方法是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","功能提高小于费用提高",false,{"key":16,"text":17,"correct":18},"B","功能下降小于费用下降",true,{"key":20,"text":21,"correct":14},"C","功能下降大于费用下降",{"key":23,"text":24,"correct":14},"D","功能不变，费用增加","价值工程——是通过对研究对象的功能与费用的系统分析，以提高价值为目标，以功能分析为核心，以创新为支柱的技术分析与经济分析相结合，有效控制工程成本与功能协调的方法。 在价值工程中，价值的定义为： 因此，提高价值的方法有：①功能提高，费用不变；②功能不变，费用降低；③功能提高，费用下降；④功能提高大于费用提高；⑤功能下降小于费用下降。",{"id":6,"name":27,"category":28,"favorite":29},"基本制度与政策（含相关知识）","职业资格",0]