[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-344914":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},344914,139,1,"单选题","后续开发的开发成本、管理费用、销售费用通常不是集中在一个时点发生，而是分散在一段时间内不断发生，但计息时通常将其假设为在所发生的时间段内均匀发生，并具体视为集中发生在该时间段的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","期初",false,{"key":16,"text":17,"correct":18},"B","期中",true,{"key":20,"text":21,"correct":14},"C","期末",{"key":23,"text":24,"correct":14},"D","任意阶段","本题考查的是假设开发法测算中各项的求取。后续开发的建设成本、管理费用、销售费用通常不是集中在一个时点发生，而是分散在一段时间内不断发生，但计息时通常将其假设为在所发生的时间段内均匀发生，并具体视为集中发生在该时间段的期中。",{"id":6,"name":27,"category":28,"favorite":29},"估价理论与方法","职业资格",0]