[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-344885":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},344885,139,1,"单选题","建筑物重新购建成本的求取方法中，将建造日期时的建安工程费调整为价值时点时的建安工程费的方法称之为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单位比较法",true,{"key":16,"text":17,"correct":18},"B","分部分项法",false,{"key":20,"text":21,"correct":18},"C","工料测量法",{"key":23,"text":24,"correct":18},"D","指数调整法","本题考查的是建筑物重新购建成本的求取方法。单位比较法的实质是比较法。即修正：将实际而可能不是正常的单位建安工程费修正为正常的单位建安工程费，将建造日期时的建安工程费调整为价值时点时的建安工程费，将可比实例的状况调整到估价对象的状况。",{"id":6,"name":27,"category":28,"favorite":29},"估价理论与方法","职业资格",0]