[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-344225":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},344225,138,1,"单选题","甲公司于3年前以出让方式取得一宗商业用地使用权，土地使用期限为40年，约定不可续期。经批准规划建设方案为：容积率为12，设计高度为150m，设计用途为酒店。该项目基础工程完成时，因城市规划调整，酒店设计高度被降至120m。酒店现已按期竣工。为确定规划调整给该开发项目造成的损失，甲公司委托乙房地产估价机构进行评估。经分析测算，规划调整导致该酒店建造成本较同类酒店高出1020万元，使用成本年均高出2万元，功能缺陷导致年均收益损失50万元，报酬率为7%。 规划调整给该酒店造成的价值减损额为（ ）万元。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","655.85",false,{"key":16,"text":17,"correct":14},"B","682.08",{"key":19,"text":20,"correct":14},"C","1675.85",{"key":22,"text":23,"correct":24},"D","1702.08",true,"",{"id":6,"name":27,"category":28,"favorite":29},"房地产案例与分析","职业资格",0]