[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-333657":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},333657,114,1,"单选题","基坑或管沟开挖因场地限制等原因不能放坡时，可采用设置支撑与护壁桩的方法。开挖深度大于6m的基坑，临近有建筑，不允许支撑有较大变形时，应采用（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","短桩隔断支撑",false,{"key":16,"text":17,"correct":14},"B","地下连续墙支护",{"key":19,"text":20,"correct":14},"C","钢构架支护",{"key":22,"text":23,"correct":24},"D","挡土护坡桩支撑",true,"",{"id":6,"name":27,"category":28,"favorite":29},"安全生产技术基础","职业资格",0]