[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-327045":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},327045,113,1,"单选题","某建设工程公司将总包的某工程中的部分项目进行发包，各分项目工程分别由各项目部负责管理，应（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","以公司名义与承包商签订协议",true,{"key":16,"text":17,"correct":18},"B","以分项工程项目部名义与承包商签订协议",false,{"key":20,"text":21,"correct":18},"C","以工程管理部名义与承包商签订协议",{"key":23,"text":24,"correct":18},"D","以业主的名义与承包商签订协议","",{"id":6,"name":27,"category":28,"favorite":29},"安全生产管理","职业资格",0]